Tumble Dryers

WP C10X WBS EE Tumble Dryer 10kg with Heat Pump

Key features:

  • New Energy Class: C
  • Number of Programs: 15
  • 6th Sense Technology
  • Dimensions: 84.6 x 59.8 x 67.4 cm

Enjoy perfectly dry clothes with Heat Pump technology that cares for fabrics with low energy consumption.

See full description

Top specs

  • See all
629 99 €
Delivery Thu, 05 Nov - Mon, 09 Nov
14,99 €   shipping cost
From Kotsovolos 4.9 (50)
Αθήνα, Αττικής
1 piece
See Large Appliances on the page of Kotsovolos
What if it breaks?

You're covered by the statutory 2-year warranty. Contact us and we'll handle the entire process with the store, ensuring your issue is resolved with prompt support through a repair, replacement, or refund.

What if I change my mind?

No problem, as long as it's within 14 days. We'll come and pick it up (completely free of charge if you have Skroutz Plus) and refund your money.

Is delivery to a floor free?

Yes, we will carry it up to the floor for you, without any restrictions.

  • Installation: 40,00 €
  • Uninstallation: 15,00 €
You can select additional services after adding the product to the cart.

Morris

Πλυντήριο ρούχων WIW-11216BA2

Ρούχα χωρίς τρίχες. Λογαριασμοί χωρίς εκπλήξεις!

Discover here Discover here
Πλυντήριο ρούχων WIW-11216BA2

Description

Description

At a glance

    ✓ Heat Pump – energy-efficient drying at low temperature with fabric protection

    ✓ 6th Sense & Precision Dry – smart cycle adjustment with humidity and temperature sensors

    ✓ Adaptive Dry – customized drying according to your preferences via app

    ✓ SoftMove & 3D AirCare – gentle and even drying with multiple airflows

    ✓ Iron Touch – clothes ready to wear without wrinkles

    ✓ Quick Option – fast drying without quality loss

    ✓ Motor Inverter – economical and quiet operation

    ✓ Wi-Fi & 6th Sense Live App – control and schedule cycles from your mobile

      Silent and efficient drying

      The Whirlpool WPC10XWBSEE dryer with Heat Pump technology offers gentle and quiet drying, protecting delicate fabrics. The low temperature of 40°C allows fibers to be preserved as on the first day, while energy consumption remains low. Regardless of the load size, drying is uniform and reliable, making every use enjoyable.

      Intelligent control with 6th Sense

      The 6th Sense technology detects the moisture and the amount of clothes, automatically adjusting the duration and temperature of the cycle. The result is always ideal: neither under-drying nor overheating. The Precision Dry system complements this smart function, protecting fabrics from damage and saving energy and time.

      Personalized care with Adaptive Dry

      With Adaptive Dry technology, each cycle adapts to your needs. Through the HomeWhiz app, the dryer learns your preferences, such as drying level and cycle duration, and automatically optimizes future settings. This way, garment care becomes smart and always tailored to you.

      Gentle motion and fabric protection

      The SoftMove technology combines asymmetric drum movements for even distribution of clothes and perfect drying results. Together with 3D AirCare, which uses multiple air and steam flows, clothes dry gently and remain pleasant to the touch, without creasing.

      Ready to Wear with Iron Touch

      With Iron Touch technology, clothes come out of the dryer clean and ready to use, as if they had been ironed. The smart steam production at the right time and temperature ensures perfect drying without extra effort.

      Multiple drying options

      With 15 different programs and 4 drying levels, you can customize each process to the needs of your fabrics: cotton, synthetic, wool, silk, denim, or even duvets. The option to choose accelerated drying with the Quick Option gives you fast and effective results, without compromising on quality.

      Easy Control and Connectivity

      The WPC10XWBSEE offers full remote control via Wi-Fi and the 6th Sense Live App. You can monitor and adjust every cycle directly from your mobile phone, while the scheduled start function integrates seamlessly into your daily routine.

      Why choose it?

      • Perfectly dry clothes with low energy consumption
      • Protection of delicate fabrics thanks to Heat Pump technology
      • Personalized drying with Adaptive Dry
      • Ready-to-use clothes with Iron Touch
      • Uniform drying with SoftMove & 3D AirCare
      • Quiet and efficient operation with Motor Inverter
      • Cycle control and programming via Wi-Fi & 6th Sense Live App

      Manufacturer

      See full description

      Specifications

      Specifications

      Product Details

      Capacity
      10 kg
      Heat Pump
      Yes
      Number of Programs
      15
      Colour
      White

      Energy Label

      Energy Class
      C
      Energy Consumption
      113 kwh/100 cycles
      Condensation Efficiency
      B
      Condensation Efficiency
      91 %
      Noise Energy Class
      B
      Noise Level
      63 dB
      Program Duration (Eco)
      3:40 hrs

      Features & Functions

      Delay Start Feature
      Yes
      Digital Display
      Yes
      Self-Cleaning Condenser
      Yes
      Sewer Connection
      Yes
      Filter Cleaning Indicator
      No
      Locking Safety
      Yes
      Add Clothes Function
      Yes
      Eco Mode
      Yes

      Dimensions

      Height
      84.6 cm
      Width
      59.8 cm
      Length
      67.4 cm

      Smart Features

      Smart Functions
      Yes
      Connectivity
      Wi-Fi

      Technologies

      Whirlpool
      6th Sense

      Important information

      Specifications are collected from official manufacturer websites. Please verify the specifications before proceeding with your final purchase. If you notice any problem you can report it here.

      See all specifications

      Reviews (1)

      Reviews

      1. 5 stars
        0
      2. 4 stars
        0
      3. 1
      4. 2 stars
        0
      5. 1 star
        0
      Review this product
      • nxatz10
        3
        0 out of 6 members found this review helpful

        Verified purchase

        My surprise was immense when I realized that the manufacturer, as they told me over the phone, their technicians did not know the details of the basic connection/operation of the dryer I bought, because it is a very new model, while the connection instructions were incomplete ..!!!

        Translated from Greek ·
        Did you find this review helpful?
      • My surprise was immense when I realized that the manufacturer, as they told me over the phone, their technicians did not know the details of the basic connection/operation of the dryer I bought, because it is a very new model, while the connection instructions were incomplete ..!!!

        Translated from Greek ·
        0
      • See all
      Questions (1)

      Questions

      24 users have this product and can help you

      Ask for the product
      nxatz10

      Το στεγνωτήριο διαθέτει συρτάρι με δοχείο των υδρατμών που συλλέγει κατά το στέγνωμα, ενώ παράλληλα έχει από πίσω έξοδο με σωλήνα που συνδέεται με την αποχέτευση. Το ερώτημα είναι γιατί όταν γεμίζει το δοχείο στο συρτάρι το στεγνωτήριο σταματά να δουλεύει μέχρι να το αδειάσεις, ενώ όμως υπάρχει ο σωλήνας συνδεδεμένος με την αποχέτευση από πίσω του...!!!

      See all questions (1)

      Description & Specifications

      At a glance

        ✓ Heat Pump – energy-efficient drying at low temperature with fabric protection

        ✓ 6th Sense & Precision Dry – smart cycle adjustment with humidity and temperature sensors

        ✓ Adaptive Dry – customized drying according to your preferences via app

        ✓ SoftMove & 3D AirCare – gentle and even drying with multiple airflows

        ✓ Iron Touch – clothes ready to wear without wrinkles

        ✓ Quick Option – fast drying without quality loss

        ✓ Motor Inverter – economical and quiet operation

        ✓ Wi-Fi & 6th Sense Live App – control and schedule cycles from your mobile

          Silent and efficient drying

          The Whirlpool WPC10XWBSEE dryer with Heat Pump technology offers gentle and quiet drying, protecting delicate fabrics. The low temperature of 40°C allows fibers to be preserved as on the first day, while energy consumption remains low. Regardless of the load size, drying is uniform and reliable, making every use enjoyable.

          Intelligent control with 6th Sense

          The 6th Sense technology detects the moisture and the amount of clothes, automatically adjusting the duration and temperature of the cycle. The result is always ideal: neither under-drying nor overheating. The Precision Dry system complements this smart function, protecting fabrics from damage and saving energy and time.

          Personalized care with Adaptive Dry

          With Adaptive Dry technology, each cycle adapts to your needs. Through the HomeWhiz app, the dryer learns your preferences, such as drying level and cycle duration, and automatically optimizes future settings. This way, garment care becomes smart and always tailored to you.

          Gentle motion and fabric protection

          The SoftMove technology combines asymmetric drum movements for even distribution of clothes and perfect drying results. Together with 3D AirCare, which uses multiple air and steam flows, clothes dry gently and remain pleasant to the touch, without creasing.

          Ready to Wear with Iron Touch

          With Iron Touch technology, clothes come out of the dryer clean and ready to use, as if they had been ironed. The smart steam production at the right time and temperature ensures perfect drying without extra effort.

          Multiple drying options

          With 15 different programs and 4 drying levels, you can customize each process to the needs of your fabrics: cotton, synthetic, wool, silk, denim, or even duvets. The option to choose accelerated drying with the Quick Option gives you fast and effective results, without compromising on quality.

          Easy Control and Connectivity

          The WPC10XWBSEE offers full remote control via Wi-Fi and the 6th Sense Live App. You can monitor and adjust every cycle directly from your mobile phone, while the scheduled start function integrates seamlessly into your daily routine.

          Why choose it?

          • Perfectly dry clothes with low energy consumption
          • Protection of delicate fabrics thanks to Heat Pump technology
          • Personalized drying with Adaptive Dry
          • Ready-to-use clothes with Iron Touch
          • Uniform drying with SoftMove & 3D AirCare
          • Quiet and efficient operation with Motor Inverter
          • Cycle control and programming via Wi-Fi & 6th Sense Live App

          Manufacturer

          Product Details

          Capacity
          10 kg
          Heat Pump
          Yes
          Number of Programs
          15
          Colour
          White

          Energy Label

          Energy Class
          C
          Energy Consumption
          113 kwh/100 cycles
          Condensation Efficiency
          B
          Condensation Efficiency
          91 %
          Noise Energy Class
          B
          Noise Level
          63 dB
          Program Duration (Eco)
          3:40 hrs

          Features & Functions

          Delay Start Feature
          Yes
          Digital Display
          Yes
          Self-Cleaning Condenser
          Yes
          Sewer Connection
          Yes
          Filter Cleaning Indicator
          No
          Locking Safety
          Yes
          Add Clothes Function
          Yes
          Eco Mode
          Yes

          Dimensions

          Height
          84.6 cm
          Width
          59.8 cm
          Length
          67.4 cm

          Smart Features

          Smart Functions
          Yes
          Connectivity
          Wi-Fi

          Technologies

          Whirlpool
          6th Sense

          Important information

          Specifications are collected from official manufacturer websites. Please verify the specifications before proceeding with your final purchase. If you notice any problem you can report it here.

          Reviews (1)

          1. 5 stars
            0
          2. 4 stars
            0
          3. 1
          4. 2 stars
            0
          5. 1 star
            0
          Review this product
          • nxatz10
            3
            0 out of 6 members found this review helpful

            Verified purchase

            My surprise was immense when I realized that the manufacturer, as they told me over the phone, their technicians did not know the details of the basic connection/operation of the dryer I bought, because it is a very new model, while the connection instructions were incomplete ..!!!

            Translated from Greek ·
            Did you find this review helpful?
          • My surprise was immense when I realized that the manufacturer, as they told me over the phone, their technicians did not know the details of the basic connection/operation of the dryer I bought, because it is a very new model, while the connection instructions were incomplete ..!!!

            Translated from Greek ·
            0
          • See all
          629,99 €
          14,99 €   shipping cost