Tumble Dryers

Whirlpool WP A8X WBS EE Tumble Dryer 8kg with Heat Pump

Key features:

  • Energy Class: A
  • Number of Programs: 15
  • Dimensions: 85 x 60 x 68 cm

Whirlpool dryer with ultra-quiet operation, interior drum lighting, and premium design for maximum care of your fabrics.

See full description

Top specs

  • See all
769 00
Installation available upon delivery
769 Coins 769 Coins
Delivery up to 14 days
12,00 €  
Delivery to your floor available
Do you want it with Free shipping?
From Bazaarelectric 5.0 (5)
Περιστέρι, Αττικής
5+ pieces
See Large Appliances on the page of Bazaarelectric
What if it breaks?

You're covered by the statutory 2-year warranty. Contact us and we'll handle the entire process with the store, ensuring your issue is resolved with prompt support through a repair, replacement, or refund.

What if I change my mind?

No problem, as long as it's within 14 days. We'll come and pick it up (completely free of charge if you have Skroutz Plus) and refund your money.

Is delivery to a floor free?

Yes, we will carry it up to the floor for you, without any restrictions.

  • Installation: 40,00 €
  • Uninstallation: 15,00 €
You can select additional services after adding the product to the cart.

Morris

Πλυντήριο ρούχων WIW-11216BA2

Ρούχα χωρίς τρίχες. Λογαριασμοί χωρίς εκπλήξεις!

Discover here Discover here
Πλυντήριο ρούχων WIW-11216BA2

Description

Description

At a glance

The Whirlpool dryer combines high aesthetics with practicality, offering a truly premium user experience.

✔ The built-in drum light is automatically activated, making loading and unloading easier than ever.

✔ Thanks to its special design, it operates extremely quietly, allowing you to use it at any time of the day without disturbing the peace of your home.

✔ The specially designed drum with high-quality paddles guarantees ideal care for all types of fabrics, protecting fibers from wear.

✔ Manufactured in Turkey, it offers reliable performance and modern design that fits any home.

✔ It is the ideal choice for those seeking the perfect balance between silent operation and effective care for their clothes.

Light everywhere, even in the darkest sock!

Have you ever lost that small, black sock at the back of the drum? With the interior lighting, that's a thing of the past! As soon as you open the door, the inside of the dryer lights up automatically, giving you perfect visibility so nothing gets left behind.

Enjoy your peace and quiet (Extra Silent)

Forget the noise that makes you close the bathroom door! This Whirlpool model is extremely quiet. It is designed to deliver top drying results while operating at very low noise levels, so you can read, sleep, or watch a movie without any disturbances.

Premium drum for perfectly cared-for clothes

The drum is not just a metal cylinder. It features a premium finish and specially designed paddles that "caress" the fabrics. This interior design ensures that your clothes dry evenly and remain soft, as if you were caring for them by hand.

Why choose it

  • Automatic lighting so you can see everything inside the drum as soon as you open the door.
  • Extremely quiet so you can use it even at night without disturbing anyone.
  • Premium drum design that provides excellent care even for the most delicate fabrics.
  • Special agitators that ensure uniform drying without effort.
  • Reliable construction with the guarantee and experience of Whirlpool.

Manufacturer

See full description

Specifications

Specifications

Product Details

Capacity
8 kg
Heat Pump
Yes
Number of Programs
15
Type of Programs/Cycles
-
Colour
-

Energy Label

Energy Class
A
Energy Consumption
73 kwh/100 cycles
Condensation Efficiency
A
Condensation Efficiency
94 %
Noise Energy Class
A
Noise Level
60 dB
Program Duration (Eco)
3:55 hrs

Features & Functions

Delay Start Feature
Yes
Digital Display
Yes
Self-Cleaning Condenser
-
Sewer Connection
-
Filter Cleaning Indicator
No
Locking Safety
-
Add Clothes Function
-
Eco Mode
-

Dimensions

Height
85 cm
Width
60 cm
Length
68 cm

Smart Features

Smart Functions
No

Technologies

Whirlpool
-

Important information

Specifications are collected from official manufacturer websites. Please verify the specifications before proceeding with your final purchase. If you notice any problem you can report it here.

See all specifications
Questions

Questions

Do you have a question about the product?

Those users who have this product can help you

Ask for the product

Description & Specifications

At a glance

The Whirlpool dryer combines high aesthetics with practicality, offering a truly premium user experience.

✔ The built-in drum light is automatically activated, making loading and unloading easier than ever.

✔ Thanks to its special design, it operates extremely quietly, allowing you to use it at any time of the day without disturbing the peace of your home.

✔ The specially designed drum with high-quality paddles guarantees ideal care for all types of fabrics, protecting fibers from wear.

✔ Manufactured in Turkey, it offers reliable performance and modern design that fits any home.

✔ It is the ideal choice for those seeking the perfect balance between silent operation and effective care for their clothes.

Light everywhere, even in the darkest sock!

Have you ever lost that small, black sock at the back of the drum? With the interior lighting, that's a thing of the past! As soon as you open the door, the inside of the dryer lights up automatically, giving you perfect visibility so nothing gets left behind.

Enjoy your peace and quiet (Extra Silent)

Forget the noise that makes you close the bathroom door! This Whirlpool model is extremely quiet. It is designed to deliver top drying results while operating at very low noise levels, so you can read, sleep, or watch a movie without any disturbances.

Premium drum for perfectly cared-for clothes

The drum is not just a metal cylinder. It features a premium finish and specially designed paddles that "caress" the fabrics. This interior design ensures that your clothes dry evenly and remain soft, as if you were caring for them by hand.

Why choose it

  • Automatic lighting so you can see everything inside the drum as soon as you open the door.
  • Extremely quiet so you can use it even at night without disturbing anyone.
  • Premium drum design that provides excellent care even for the most delicate fabrics.
  • Special agitators that ensure uniform drying without effort.
  • Reliable construction with the guarantee and experience of Whirlpool.

Manufacturer

Product Details

Capacity
8 kg
Heat Pump
Yes
Number of Programs
15
Type of Programs/Cycles
-
Colour
-

Energy Label

Energy Class
A
Energy Consumption
73 kwh/100 cycles
Condensation Efficiency
A
Condensation Efficiency
94 %
Noise Energy Class
A
Noise Level
60 dB
Program Duration (Eco)
3:55 hrs

Features & Functions

Delay Start Feature
Yes
Digital Display
Yes
Self-Cleaning Condenser
-
Sewer Connection
-
Filter Cleaning Indicator
No
Locking Safety
-
Add Clothes Function
-
Eco Mode
-

Dimensions

Height
85 cm
Width
60 cm
Length
68 cm

Smart Features

Smart Functions
No

Technologies

Whirlpool
-

Important information

Specifications are collected from official manufacturer websites. Please verify the specifications before proceeding with your final purchase. If you notice any problem you can report it here.

769,00 €
12,00 €  
Delivery to your floor available